Safety

Hazards and Risk Assessments

Keep a hazard register, score risk on the 5 × 5 matrix, add mitigations, and run risk assessments

The Hazards register lists known hazards for the aircraft or the whole fleet, with their risk and the controls in place. Risk Assessments look at one activity or operation and list the hazards that apply to it.

Where to find it

Open the aircraft, choose Safety, then Hazard Register or Risk Assessments in the left sidebar.

How risk is scored

Both registers use a 5 × 5 matrix: likelihood (rows) times severity (columns). The score sets the risk level:

ScoreRisk level
15 to 25High
8 to 14Medium
1 to 7Low
Not scoredUnrated

How to add a hazard

  1. On Hazard Register, select New hazard.
  2. Tick Fleet-wide if it applies across the whole fleet rather than this aircraft.
  3. Enter a Title and Description, choose a Category, and set a Next review date if you want a review reminder.
  4. Pick the Inherent risk on the matrix (before any controls). You can skip this if it has not been assessed yet.
  5. Select Create hazard. The hazard gets a number (HAZ-year-number) and starts with status Open.

How to add a mitigation

  1. Open the hazard and select Add mitigation.
  2. Describe the control and choose its Type (hierarchy of control): Eliminate, Substitute, Engineering controls, Administrative controls or PPE.
  3. Set an Effectiveness and a Due date if you have them.
  4. Pick the Residual risk (post-mitigation) on the matrix. If the hazard's inherent risk is scored, the residual likelihood and the residual severity can each be no higher than the inherent ones.
  5. Select Add mitigation.

When the controls are in place, select Mark mitigated. If you decide to live with the risk as it is, select Accept risk. A mitigated or accepted hazard can go back to Open with Reopen. Use Close hazard when it no longer applies, and Reopen on recurrence if it comes back.

Mark reviewed records that you reviewed the hazard today. It does not move the Next review date: edit the hazard to set the next one.

How to run a risk assessment

  1. On Risk Assessments, select New risk assessment.
  2. Tick Fleet-wide if it covers a category of operation rather than this aircraft.
  3. Enter a Title, choose a Type (Generic, Task-based, Dynamic or Emergency response) and a Category, and describe the scope.
  4. Set Valid from, Valid until (optional) and Next review, and list any applicable regulations.
  5. Select Create risk assessment. It gets a number (RA-year-number) and starts as a Draft.
  6. On its page, select Add hazard for each hazard. Give the inherent risk, the Controls applied and the residual risk.
  7. When the hazards are in, select Promote to active.

On a hazard line, Promote to register copies it into the main hazard register so it is tracked on its own.

What the statuses mean

Hazards:

StatusMeaning
OpenIdentified, controls not yet in place
MitigatedControls are in place
AcceptedThe risk has been accepted as it is
ClosedNo longer applies. Can be reopened if it recurs

Risk assessments:

StatusMeaning
DraftBeing written. Only drafts can be deleted, with Delete draft
ActiveIn use
ExpiredOut of date. Use Reactivate after review to bring it back
ArchivedWithdrawn and kept for the record. Cannot be changed

A risk assessment does not expire by itself when its Valid until date passes: use Set as expired. Use Archive to withdraw a draft, active or expired assessment. Expired and archived assessments can no longer be edited.

Reminders

When an Open hazard's or an Active risk assessment's Next review date is near or past, it appears in the compliance forecast and the account owner and admins get a "review due" notification. Mitigated, accepted and closed hazards are not included.

Who can do this

  • •Viewing needs at least Read-only access to Safety.
  • •Creating, editing, reviewing and changing status need Read & write access to Safety, or being an account owner or admin.
  • •Delete is only offered while a hazard is Open, and is refused if it has any mitigations, linked risk assessments or corrective actions. Otherwise, close it.
  • •A closed hazard can no longer be edited.